The building permit for the Väo traffic junction, which we designed, was issued on 21 October 2019. As ordered by the Road Administration, we designed a multi-level junction (interchange), as well as the necessary structures, utility networks, and vegetation. In addition to the interchange itself, we also designed the truck and motor home parking lot located next to the interchange. The structural part of the design documentation for the protection of the heating pipelines, viaducts, tunnels, and retaining walls was prepared by Järelpinge Inseneribüroo OÜ and the geotechnical report on the viaducts and tunnels was prepared by IPT Projektijuhtimise OÜ. A call for tenders for the construction work will be launched soon, and the Väo traffic junction should be completed by the end of 2021.