Airport air traffic zone

Tallinn Airport is planning to expand its air traffic zone on the basis of preliminary and detailed design documentation prepared by our engineers. The designs were prepared as a building information model (BIM), which was linked to the existing, previously implemented phase 1 extension zone model. Preparations for the construction work are set to start in June and the project is expected to be completed in 2021.

Read more Close
Expected time of completion: 2021